The cylinder is the first 80 ton to be removed and fitted into the transport frame we made.
Once all of the cylinders have been lowered into the transport frames they will be winched outside onto the other steelwork we made so they can be lifted by a 500 ton crane and loaded onto a lorry for transport to where they will be cut up.